Consequence of EU’s regulation, the largest energy, infrastructure and housing developers across Europe are forced into pushing EU’s environmental requirements down the supply chain.

Contractors working under those developers receive a set of requirements that they need to comply with. At the same time, the construction industry is characterized by its atomic structure. A construction project is formed by multiple levels of subcontracting companies, rotating personnel and supplier diversity. Environmental compliance demands the transfer of these requirements down the supply chain and, surely, cope with the auditing demands associated to the imposition of requirements.

The largest and most strategic investment projects that are currently being tendered set a high bar with regards to environmental compliance. While still far from the standards of the manufacturing or food industries, construction is picking up pace and increasing its demands fast. Some examples are summarized below:

  1. Selection of materials and prioritisation of those with less dangerous substances or lower carbon footprint.

  2. Selection of machinery and fuels with lower carbon footprint.

  3. Selection of construction methods that lead to lower environmental impact or ecosystem impact (dust, noise, waste, CO2 emissions, etc.)

  4. Increased site control and environmental hazard mitigation actions (protocols, risk prevention measures, etc.)

  5. Reporting site operations data: fuel consumption and other consumables, trash, noise levels, etc.

  6. Monitoring of inbuilt resources, traceability and storage of all its associated data.

The later are the key component of this project for the complexities that will be further detailed below.

Traceability requirements

Regulators aim to gain more control regarding the in-built products on European sites. This control translates as impositions regarding which products, materials or goods are being placed or installed on each project. There are several layers of precision, these can be:

  1. Installed goods in the project

  2. Installed goods in the project and relation to its position or placing

  3. Installed goods in the project and generation of As-Built documentation on BIM.

At the same time, there are also specifications regarding which kind of data is meant to be documented. Below, some examples:

  • Datasheets and product specifications [documents]
  • Compliance Declarations, CE mark, Conformity declarations, etc. [documents]
  • Environmental KPIs or other high-detail data (e.g. chemical contents, etc.) [data]

Basically, the above implies the generation and safekeeping of a database that contains all the materials and all the associated data and documents.

The reality of the construction industry

The complexity of implementing the traceability demands

While the above might seem straight forward, there are several layers of complexities when implementing a methodology that could yield results as per the imposed demands. Some have been previously introduced, here a comprehensive review from a contractor’s perspective.

Layer of complexity Impact
Prescription and purchasing When designers propose a technical solution, most often, there are only prescripted properties/characteristics (dimensions, specifications, ISO, Eurocode, etc.) and rarely there is a specific product that is prescripted. Therefore, throughout the purchasing process, the buyer is intended to choose amongst the products that fit on those descriptions. It is an industry standard that the suppliers offer similar products to the ones specified in the purchasing agreement. This naturally generates a misalignment between what is designed or purchased and what arrives onsite.
Lack of data – documentation Only the largest and most global suppliers own comprehensive databases of their products with all the demanded documentation. In a construction project, not even 15% of the purchased materials will have complete information as per the highest traceability demands. It takes an insane effort to gather all this data. This effort manifests mainly as: Analysing what kind of documentation is of application on each case. Explanation and educating on the requested info. What it is. Chasing and continuously reviewing for missing documentation. Validation of received documentation. Auditing. These efforts are especially hard when the suppliers have never worked on projects of high demand. It demands a lot of energy spent in divulgation.
Subcontracting chain Several layers of subcontracting are the most frequent scenario in a construction project. Very rarely it is the contractor who carries out the purchasing of the totality of the materials. Therefore, an effective methodology must be put in place for: Communication of environmental contract requirements down the supply chain. Capturing data from purchased products Auditing mechanisms for validation of the data of the purchased products Mechanisms to document the placement of the products onsite and other traceability demands.
Atomic organisations High rotation of personnel is an added difficulty when it comes to compliance with complex demands. Requirements are to be transferred and understood by everyone in the project. This adds another layer of complexity and increased workload on the communication as well as further risk.
Technical capacities and knowledge across supply chain In large construction projects it is frequent to find qualified personnel, engineers and technicians that have knowledge on sustainability issues. However, the further one goes into the subcontracting chain, the more frequent is is to find uneducated or low-skilled labour with little capacity or willingness to understand complex requirements.
Receptioning and site chaos Site operations are also quite unstructured in construction projects. After certain level, everything happening onsite is the consequence of improvisation. This leaves little ground for standardized forms for tracking installed materials.

The consequence in the traceability problem

Years of observation and experience in the field provide a comprehensive view on the undesired outcome that excessive imposition without auditing leads to. As key points, top to bottom:

  • Contractors are flooded with demands that sometimes not even their clients understand. They are just being pushed down.
  • Contractors do not get paid extra for the extra effort and cost that derives from complying with those demands.
  • Clients audit but not too much. The clients themselves are aware that the demands are sometimes excessive and that contractors have low capacity to implement them (budget, resources or qualifications). Auditing also demands resources and intensive presence onsite, which owners do not have.
  • The contractors see themselves in a position where they need to push down requirements through an infinite subcontracting chain. Surely contractors realise that, again, subcontractors are not getting paid enough to comply with all those requirements. And the process repeats itself.

All the above can be summarized as low incentive. That, added to the actual complexity of complying with the impositions; leads to significant mediocrity in the data deliveries. For instance:

  • unmet requirements that are not corrected until audit,
  • unprecise reporting,
  • and mostly, incomplete traceability information or erroneous.

The only solution

ODEI envisions technology as the only way forward. Data management, collaboration and automation of the some tasks are the only way forward to stay afloat in the compliance tsunami that is coming.

Furthermore, compliance opens a window of opportunity to finally motivate those construction executives to embrace the digital transformation. Imposition is a great excuse and trigger to finally change the procedures onsite, trust organizational capacity, confront blockers and open up for digitalization.

Controla costes y plazos de cada obra

Te enseñamos ODEI con tus datos en una demo de 45 minutos.

Solicitar más información